|
|
|
|
|
| Picture | Type | Size |
![]() |
PaverRail |
7'8" |
![]() |
EdgePro |
7'6" |
Install compacted aggregate base. Consult your paving stone supplier for proper width and depth for the specific application.
Determine proper positioning and install paver edging directly on top of compacted aggregate base prior to screeding sand and setting pavers. Paver edging can be installed with anchoring spikes or staples underneath or outside the edge of the pavers.
No snipping or cutting is necessary for easy installation of radius designs. Simply bend the paver restraint into the desired radius.
Secure the paver edging by driving stakes or spikes into compacted base.
Recommended spike placement is every 18 inches.
Backfill perimeter with topsoil, seed or sod as specified.
Send mail to
webmaster@morrisongravel.com with
questions or comments about this web site.
|